Factory

Factory

The whole factory covers an area of 30,000 square meters (exclude tridimen-sional storehouse).All the raw materials are transported within one facility to

reduce the secondary pollution.

With the help of OA+ERP system, from receving a PO to place the order and manufacturing prWith 8 hours we can produce 40 tons liquid(taking 30ml

tube- as example, we can produce liquid for 1.3million tubes).All the boiler will adapted CIP cleaning method. All the water will be II grade water.

There will be 6 Semi-Automatic lines and 8 full-automatic lines. We can fill 500000-600000 tubes or bottles

with 8 hours.ocess will make us a paperless office.Totally tube workshop

will be 6 printing lines, and print 8 colors the most.. Two automatic head injecting machine( most advanced in

China now), Labeller and Full-automatic gold stamping machine, full-automatic UV printing machine, sealing machine for shrink film. The diameter of mould will be from 19cm to 50cm.

Bottle workshop can produce PE and two layers PE bottle. With labeller and multi-color UV printing machine.

There will be 50 injection machines, daily output will be 800000pcs to 1200000pcs.

Largest operatable size will be 35*30*11cm.
There will be 5 normal soap production line and one Cold process Soap making

line.
8 hours output will be 20tons( 1 million 20g soap)
Each month we can finish 20-25 sets mould. All injection mould, blowing mould, injection head mould and soap mould we can finish within our company.